Welcome to Zhongshenglong decoration waterproof
Back List
Current Position:Home > News > Industry trends
深圳屋顶防水的几大步骤知多少
From:2023.03.23

Let's learn about the major steps of roof waterproofing with Shenzhen Zhongshenglong Roof Waterproofing. How much do you know? The content is as follows:




1. The floor concrete shall be compacted and leveled




2. Prepare sufficient excellent waterproof materials based on the construction area




Clean the construction site, especially remove loose soil accumulated in dead corners and recesses, and make up for it




4. Use a sufficient amount of base treatment agent for priming. This product is hydrophilic and not afraid of moisture. It has the function of filling pores, strengthening the surface layer, inhibiting foaming, and increasing adhesion.




5. For places prone to cracking and water leakage or places where construction is difficult at dead corners of buildings, local reinforcement and crack consolidation should be carried out first.




6. Adopt excellent waterproof materials with good weather resistance, low water absorption, strong adhesion, and scalability as the waterproof layer, which is not affected by the terrain and features. After completion, form a whole waterproof layer, forming an integral part with the building, achieving a once and for all waterproof effect.




"Any product will be afraid of damage from the sun's ultraviolet rays, but only for a short period of time. It is also necessary to insulate the roof, using an insulation layer as a protective layer to make waterproof once and for all, killing two birds with one stone.".




8. After the waterproof layer is completely formed and dried, it can be used as a thermal insulation protective layer or other facilities.